Laserfiche WebLink
CHS NorthEast Modernization Project ( 2008 — 2019 ) <br /> Phase I (Mariam Cannon Haves) <br /> $16.3 M Hayes Family Center is renovated to address infrastructure deficiencies and serve <br /> as a Women's Hospital. <br /> Phase II (Modernization Facility Expansion) <br /> $115.2 M CVOR's and CVRU consolidated to the existing Surgery Center. A new 3 level <br /> outpatient and inpatient services addition constructed to consolidate operations <br /> and efficiencies for diagnostics and inpatient beds (entrance via Medical Arts <br /> Building). <br /> 1st Floor: Outpatient Diagnostic Center (2 Interventional Radiology, Nuclear <br /> Medicine, <br /> Electrophysiology, 2 Cath Labs, Diagnostic Cardiology) <br /> 2nd Floor: Cardiac Intensive Care Beds <br /> 3rd Floor: Post Coronary Care Med Surg Beds <br /> Includes circulation core, basement-thru-4, staff efficiency & vertical <br /> access to CSB <br /> Phase III (Legacy Modernization Project) <br /> $24.5 M G,H, and J wings extensively renovated to allow 30 bed units with appropriate <br /> 9/15/2017 room/bathroom sizes, more efficient staffing and needed support space. 19 <br /> Xw - <br /> 60- 0mdj Carolinas HcalthCare System A <br /> C-2 Page 222 ad <br />