My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2016 10 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2016
>
AG 2016 10 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 11:49:10 AM
Creation date
11/27/2017 10:35:17 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/17/2016
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE FOUR: Landscape Perimeter Buffer Yards <br />How to use the following table: First, determine the acreage of the property that is being developed. Then, look to the vertical column on the left that corresponds to the required buffer yard level. Read across until you have <br />located the acreage column. Buffer yard requirements appear vertically under the acreage column. For example, a parcel over three acres but less than 3.5 acres, requiring a level one buffer yard, would need a yard of at least 58 <br />feet wide with 2 shade or 4 ornamental trees per every 50' linear feet and 15 shrubs per every 50' linear feet. <br />If project acreage is <br />less than: <br />0.5 <br />1 <br />1.5 <br />2 <br />2.5 <br />3 <br />3.5 <br />4 <br />4.5 <br />5 <br />5.5 <br />6 <br />6.5 <br />7 <br />7.5 <br />8 <br />9 <br />9 <br />9.5 <br />10 or more acres <br />Landcape Buffer Yard <br />Requirement is: <br />Buffer yard # 1 <br />Width of yard <br />43' 1 46' 1 49' 52' 1 55' 58' 1 61' 1 64' 1 67' 1 70' 1 73' 76' 1 79' 82' 1 85' 88' 191 94' 1 97' 1 100' <br />2 shade trees or 4 ornametals for every 50' <br />15 shrubs for every 50' <br />Buffer yard # 2 <br />Width of yard <br />25' 27' 30' 33' 36' 38' 41' 43' 46' 49' 15 1' 54' 57' 59' 62' 65' 167 170 172 75' <br />2 shade trees or 4 ornamental for every 50' <br />10 shrubs for every 50' <br />Buffer yard # 3 <br />Width of yard <br />12' 14' 16' 18' 20' 22' 24' 26' 28' 30' 32' 34' 36' 38' 40' 42' 44' 46' 48' 50' <br />1 shade tree or 2 oranmental for every 50' linear feet <br />8 shubs for every 50' <br />Applicants are encouraged to retain existing natural vegetative buffers on sites being developed. Existing vegetation located in the required buffer area that meets the standards for plantings as listed in section 9 -6.5 may be <br />counted towards the required number of plantings. <br />Attachment number 2 \n <br />G -4 Page 344 <br />
The URL can be used to link to this page
Your browser does not support the video tag.