My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 03 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 03 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:14:17 PM
Creation date
11/27/2017 11:14:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 I The following summary details the total cost associated with the GMP: <br />CABARRUS COUNTY BOARD OF ELECTIONS <br />$ 959,734.00 <br />GMP — EXECUTIVE SUMMARY <br />' <br />The cost for the complete scope of work associated with the Cabarrus County Board of Elections <br />renovations project, in Concord, NC, is $1,189,338.00. The total cost is defined by the following <br />$ 982,709.00 <br />items: <br />' <br />• Yates - Chreitzberg- Hughes Architects Bid Document Drawings, Dated December 24, <br />2010. (See Attachment "B" — YCH Architects List of Drawings, included with this <br />$ 2,800.00 <br />document). <br />Cost of the Work Total: <br />- CM. Black General Conditions *: <br />• Yates - Chreitzberg- Hughes Architects Bid Documents Project Manual, Dated December <br />24, 2010. (See Attachment "A° -- YCH Architects List of Drawings, included with this <br />$ 79.318.00 <br />document). <br />• CM Black Construction Co, Inc.'s Bid Package Manual, Dated December 3, 2010. <br />' <br />• CM Black Construction Co, Inc.'s Addendums #1 and #2. <br />1 I The following summary details the total cost associated with the GMP: <br />' Subtotal: $1,146,321.00 <br />Contingency of 4% based on Cost of the Work Total: $ 43.017.00 <br />Total: $ 1,189,338.00 <br />' Deduct Alternate #8 - FM 200 System: $ 11.304.00 <br />GRAND TOTAL OF GMP: $1,178,034.00 <br />' *General Conditions and Fee equals 15.08% of the Cost of the Work. <br />1 <br />- mber 3 <br />I 797 DAVIDSON DRIVE CONCORD,NC28025 1 704.788.4438 PHONE 1 704.782.1192 FAX <br />G -3 Page 162 <br />Trade Package Cost: <br />$ 959,734.00 <br />Contractor's Insurance Program: <br />$ 22,975.00 <br />Direct Work Sub - Totals: <br />$ 982,709.00 <br />' <br />- Payment / Performance Bonds: <br />$ 10,590.00 <br />- Builder's Risk Insurance: <br />$ 2,800.00 <br />t <br />Cost of the Work Total: <br />- CM. Black General Conditions *: <br />$ 996,099.00 <br />$ 70,904.00 <br />- CM Black C.M. Fees: <br />$ 79.318.00 <br />' Subtotal: $1,146,321.00 <br />Contingency of 4% based on Cost of the Work Total: $ 43.017.00 <br />Total: $ 1,189,338.00 <br />' Deduct Alternate #8 - FM 200 System: $ 11.304.00 <br />GRAND TOTAL OF GMP: $1,178,034.00 <br />' *General Conditions and Fee equals 15.08% of the Cost of the Work. <br />1 <br />- mber 3 <br />I 797 DAVIDSON DRIVE CONCORD,NC28025 1 704.788.4438 PHONE 1 704.782.1192 FAX <br />G -3 Page 162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.