Laserfiche WebLink
General Requirements - Breakdown <br />1 Lead Paint Abatement <br />2 Daily Clean -up <br />3 Dumpster & Tipping Fees <br />4 Temp Lighting/Wiring <br />5 Temp. Heat Expenses <br />6 Temp. Cooling Expenses <br />7 Temp. Enclosures /Partitions <br />8 Prepare Operation Manuals <br />9 Prepare Maintenance Manuals <br />10 Operator On -Site Training <br />11 Subcontractor Bonds <br />12 Building & Zoning Permits <br />13 Water Tap <br />14 Irrigation Water Tap <br />15 Sewer Tap <br />16 Capital Recovery Fee <br />17 Temp Protection <br />G -3 <br />By Owner <br />$4,320 <br />$13,150 <br />$1,200 <br />$700 <br />$2,100 <br />$1,800 <br />$800 <br />$800 <br />$240 <br />$14,500 <br />$4,950 <br />Existing <br />Existing <br />$1,800 <br />Existing <br />$1,500 <br />Total $47,860 <br />Attachment number 3 <br />Page 167 <br />