Laserfiche WebLink
Bid Form scope to # mo1 December 3, 2010 <br />Cabarrus County Board of Elections <br />Concord, North Carolina <br />Roofing f Tubular Daylighting Device <br />The undersigned Skitter (Company Name) Johxison's Roofing service, Inc. <br />having carefully Investigated the existing condtttons at the project site, and having thoroughly famillarized <br />himself with the Documents conta(ned in tho construction drawings & project manual, dated December 24, <br />2010, as prepared by Yates- Chreltzberg- Hughes Architects, 145 union Street, South, Concord, NC and its <br />consultants, the CM Buck Old package, dated December 3, 2010 hereby proposes to provide all necessary <br />labor, equipment, materials, services, etc., to complete the Raofing & Tubular Daylighting Device <br />(Supplemental Oenead Conditlons, Division #07641, #07500, #Moo, #08828) as defined within the <br />Summary of the Work and all other parts of the Contract Documents. project Is located at 369 Church Street <br />North In Concord, NC on property owned by Cabarrus County. All work shall be accomplished in accordance <br />with the aforementioned Contract Documents and schedule with a Lump Sum Price as follows: <br />BASE BID: (inaludrngTaxes} Thirty Two Thousand Nine Hu»dred seventy Five Dollars 32, 975 . QO <br />Required Add: Warranty Bond Alternate Bid NIA <br />BASE 81013REAK13OWN (Price Included In Bass Bid) <br />Roofing (TPO Roofing sy$ #em) (07541) <br />Flashing & Sheet Metal (07600) <br />Roofing Accessories (07700) <br />Tubular Daylighting Device (08625) <br />Tubular Dayllghting Device •• €nstalition <br />Bid $ --L, 000.00 <br />Bid 300.00 <br />Bid $ 2 <br />Bid $ 17, 575.00 <br />Bid $ 3, 200.00 <br />The undersigned further agrees that this proposal shall be valid for a period of Sixty (60) days from the date of <br />receipt for the bids and that if this proposal is accepted by the Owner and Construction Manager within this <br />period, the Bidder will execute the contract form and provide surety bonds (if applicable) as described in the <br />Contract Documents. <br />For contracts over $50,000. the undersigned further agrees that in the case of failure on his part to execute the <br />said contract and tho bond within ten (10) consecutive calendar days after written notice being given of the <br />award of contract, the certified check, cash or bid bond accompanying this bid shall be paid into the funds of <br />the Owner's account set aside for the project, as liquidated damages for such failure, otherwise the certified <br />check, cash or bid bond accompanying this Proposal shall be returned to the undefined. <br />It Is expressly understood that the Construction Manager is expected to act as project expediter and coordinate <br />work of all other Subcontractors. <br />We estimate North Carolina Sales Tax included within our above designated Base Bid and for Alternates to be <br />$ 800.00 <br />Accompanying this proposal Is a bid security (6% of Contract Sum) in the form of: N/A <br />(for contracts over $50,000.) <br />Alternates. <br />Should any alternate be accepted, the amount written below shall be the amount to "add to" or 'deduct from' <br />the appropriate Base Bid. Refer to Section 01030 — Alternates, the Drawings and the CM Black Bid package <br />for complete description and delineation of alternate requirements as the descriptions below are not Intended to <br />CM Black Construction - Bid Form Scope JD# 07 -001 <br />Caharrim rnnni Rnard of Titartinne <br />G -3 <br />" -Attg6hment number 3 <br />Page 193 <br />J <br />