Laserfiche WebLink
Bid Form Scope ID #09-002 December3, 2010 <br />Cabarrus County Board of Elections <br />Concord, North Carolina <br />Painting & Wail Coverings <br />The undersigned Bidde (Company Name) <br />having carefully Investigated the existing conditions at the protect site, and having thoroughly familiarized <br />himself with the Documents contained in the construction drawings $ project manual, dated December 24, <br />2010, as prepared by Yates•Chreltzberg- Hughes Architects, 145 Union Street, South, Concord, NC and Its <br />consultants, the CM Black Bid Package, dated December 3, 2010 hereby proposes to provide ail necessary <br />labor, equipment, materials, services, eta, to complete Painting b Wall Coverings (Supplemental General <br />Conditions and Divisions #09900, 009200 and 0 09980) as defined within the Summary of the Work and all <br />other parts of the Contract Documents. Project Is located on 389 Church Street North on property owned by <br />Cabana County. Ail work shall be accomplished In accordance with the aforementioned Contract Documents <br />with a Lump Sum Price as follows: <br />BASS SID: gndudrrp Taxee) hv&i!7 SYJr A7U3*f 16/ 7'/l '!�/`�1� odors f5 �'*0 1 <br />The undersigned further agrees that this proposal shat be valid for a period of Sixty (60) days from the date of <br />receipt for the bids and that ff this proposal Is accepted by the owner within this period, the Bidder wit execute <br />the contract form and provide surely bonds (if applicable) as described In the Contract Documents. <br />For contracts over $50,000, the undersigned further agrees that in the case of failure on his part to execute the <br />sold contract and the bond within ton (10) consecutive calendar days after written notice being given of the <br />award of contract, the oedifted check, cash or bid bond accompanying this bid shalt be paid into the funds of <br />the owner's account set aside for the Project, as liquidated damages for such failure; otherwise the cerfified <br />check, cash or bid bond accompanying this Proposal shall be returned to the undersigned. <br />It Is expressly understood that the Construction Manager Is expected to act as project expediter and coordinate <br />work of all other Subcontractors. <br />We as to N„oojth Carolina Sales Tax Included within our above designated ease Bid and forARemates to be <br />Accompanying this proposal Is a bid security (5% of Contract Sum) In the form of. <br />(for contracts over $50,OOD.) <br />Alternates: _ <br />Should any alternate be sooepted, the amount written betvv shall be the amount to'add to' or deduct from' <br />the appropriate Base Bid. Refer to Section 01030 — Alternates, the Drawings and the CM Black Bid Package <br />for complete description and delineation of alternate requirements as the descriptions below are not intended to <br />fusty convey the scopes of work. The under signed further agrees to construct the aftemales as described in <br />the Contract Documents for the following prices: <br />Alternate Ni: (Add / Deduct) <br />Provide SCN door closers, Sohtage locksets, end Von Dupdn exist devices as spedffed In Section <br />08710 without substitution as a preferred brand. <br />Alternate #2: (Add 1 Deduct) <--� <br />Provide Honeywell thermostats In accordance to DMaton 15 specifications or the WAC drawings es a <br />preferred brand. <br />Alternate N. (Add 1 Deduct) <br />Provide Notifier fire alarm system In accordance with DMsfon 18 specifications and Electrical Drawings <br />as a preferred brand. <br />CM Black Construction — Bid Form Scope IN 09 -002 <br />Cabarrus County Board of Elections Page 92 <br />G - 3 <br />Attachment number 3 <br />Page 207 i <br />