My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 03 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 03 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:14:17 PM
Creation date
11/27/2017 11:14:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County <br />Board of Elections Project <br />REQUEST FOR INFORMATION Date Created: 01/24/11 <br />CM Black Construction Company, Inc. Date Required: by Addendum #1 <br />Architect: Yates - Chreitzberg- Hughes Arch. <br />Attn: Mike Chreitzberg / Ed Estridge <br />Submitted By: Emmitt H. Black <br />Architect Address: 145 Union Street South <br />Concord, NC 28025 <br />Pre -Bid RFI# 011 <br />INFORMATION REQUESTED: <br />Scope Reference: Fire Protection <br />Drawing and detail reference: <br />Specification section and paragraph: <br />INFORMATION REQUESTED <br />1. All sprinkler equip refers to Victaulic name brand. Can we use something <br />egual to such as sprinklers: Tyco, Viking, Reliable or Globe? Valves; <br />Viking or Reliable? <br />2. Calculations and drawings sealed by a PE? State only requires a NICET <br />Level III is this sufficient? <br />3. FP drawings call for concealed sprinklers in public areas and the spec <br />book says that all sprinklers in ceilings shall be semi- recessed pendent <br />sprinklers. Which shall we follow? <br />4. Does the sprinkler contract need to pick up the painting of exposed pipe <br />and hangers or is this park of the painters specs? <br />5. Area around existing lead -in that has no concrete, does the sprinkler <br />contractor need to figure this concrete or is this by others? <br />Signed; Emmitt Black / LS <br />RESPONSE <br />These questions will be answered by Addendum No 1. <br />Answered By: _Ed Estridge Date: — 1125/11 <br />G -3 <br />Attachment number 3 <br />Page 277 k <br />
The URL can be used to link to this page
Your browser does not support the video tag.