Laserfiche WebLink
Cabarrus County Law Enforcement Center <br />Owner-Architect Agreement <br />Amendment 10 <br />Exhibit A <br />Modify contract as follows: <br />GENERAL Whetever the term "Contractor" appears it shall mean "Construction <br />Manager-at-Risk (CM-at-Risk)" <br />Wherever the term "Contract Sum" appears it shall mean "Guaranteed <br />Maximum Price (GMP)" <br />1. l.2.5.2 Delete the following: <br />"Construction $51,147,614.00 <br />Furnishings & Equipment $ 1,242,447.00" <br />Replace with the following: <br />"to be determined by the Guaranteed Maximum Price (GMP) prepared by <br />the Consduction Manager at Risk and accepted by the Owner" <br />1.1.2.7 Delete the following: <br />"Competitive bidding to a Single Prime General Contractor" <br />Replace with the following: <br />"Construction Manager at Risk (CM-at-Risk)" <br />1.1.5 Delete the following: <br />"General Conditions of the Contract for Construction, AIA Document <br />A201, 1997 Edition: <br />Replace with the following; <br />"General Conditions of the Contract between Cabarrus County as Owner <br />and Turner Construction Company as Construction Manager at Risk" <br />1.3.7.4 Delete the following: <br />"edition of AIA Document A201, General Conditions of the Contract for <br />Construction" <br />Replace with the following: <br />"General Conditions of the Contract between Cabarrus County as Owner <br />and Tumer Conshuction Company as Construction Manager at Risk" <br />2.6.1.1 Delete the following: <br />"edirion of AIA Document A201" <br />G-s <br />i of i <br />