My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 08 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 08 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:15 PM
Creation date
11/27/2017 11:31:30 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/20/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County, NC ~ Adequate Public Facilities Ordinance <br />The specific methodology for each Public Facility subject to this Chapter is <br />discussed in Sections 15-12 through 15-20, below. <br />2. Adeauacv. <br />Adeguacy of Public Facilities is determined. by_the Adopted Level of Service .(refer _ ,.. - Deleted: n <br />to Sections 15-12 through 15-20, below. <br />8. Available Capacity. <br />Available Capacity.is Existlrlg Capacity. and Planned Capacity less Existing. _ ._ - Deleted: ¶ <br />Demand and demand that Will be generated by Committed Development: <br /> <br />where; <br />AC (available capacity) is Existing or Planned <br />Capacity of Public Facilitiesahat is not already <br />committed to existing or planned development. <br />EC (existing capacity) is he sum total of the existing Public Facilities in the <br />impact area. This includesfacilitfes that have been constructed and are fully <br />functional <br />Note - <br />what counts as planned <br />capacity and committed <br />demand varies by <br />facility -refer to <br />Sections 15-12 through <br />15-20, below. <br />PC (planned capacity) is Capacity that is added by Planned Capital <br />Improvements that is included in adopted capital improvement plans. Projects <br />must be definitively scheduled to be considered as planned capacity. <br />"Definitively scheduled" means that a date for completion of the improvement is <br />identified in the capital improvements program. <br />ED (existing demand) is the present, actual utilization of the Public Facilities. <br />Examples include existing school enrollment, trip counts, or calls for service. <br />CD (committed demand is the anticipated demand created by permitted, <br />but unbuilt development. Permitted development includes: <br />vacant, recorded lots, based upon the uses permitted in the <br />applicable zoning district; and <br />development with approved final plats; and <br />development with approved preliminary plats; and <br />Draft-Option 1-r _ _ _ _ ,16 <br />20 7 <br />L•\Documents and Settings\akhonevcutt\Local Settinds\Temoorarv Internet <br />Files\OLK7\APFO draftforBOCootlonl OB 20 07meeting.DOG <br />Formatted: Font: 30 pt <br />' Deleted: Drag <br />~, <br />' Daletetl: For Discussion Onlv <br />Deleted: September 12, 20057u1y <br />za, za07¶ <br />S:\Planning\COmmonylPFO revisions <br />2005\BOC_COmmi[tee_Options_DraR <br />s\APFD_draf[forBOCoptionl_07_24_0 <br />7.DOC <br />Formattetl: Font 10 pt <br />Deleted: C:\DOCUmen[s and <br />Deletetl: 5: \Planning\Comman\APFO <br />°~' ; revisions <br />~; ~ 2005\BOC Committee_Options_DraR <br />' s\APF9_draMorB000ption!_OB_20_0 <br />7meedng. DOGS: \Planning\COmmon\p. <br />PFO revisions <br />,' 2005\BOC_Commlttee_Optbns_Draft <br />G ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.