My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1997 09 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1997
>
AG 1997 09 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:30:43 PM
Creation date
11/27/2017 11:54:23 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/15/1997
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of at least 70 percent for the 40 micron (0.04mm) size soil <br />particle transported into the basin by the runoff of that 2- <br />year storm which produces the maximum peak rate of <br />runoff as calculated according to procedures in the United <br />States Deparhxient of Agriculture Soil Conservation <br />Service's National Engineering Field Manual for <br />Conservation Practices or according to procedures adopted <br />by any other agency of this state or the United States or any <br />generally recognized organization or association. <br /> <br />Newly constructed open channels in HQW shall be <br />designed and constructed with side slopes no steeper than 2 <br />horizontal to 1 vertical if a vegetative cover is used for <br />stabilization unless Soil conditions perii-~it a steeper slope or <br />where the slopes are stabilized by using mechanical devices, <br />structural devices or other acceptable ditch liners. In any <br />event, the angle for side slopes shall be sufficient to restrain <br />accelerated erosion. <br /> <br />Must be provided for any portion of land-disturbing <br />activity in a HQW zone within 15 working days or 60 <br />calendar days following completion of construction or <br />development, whichever period is shorter. <br /> <br />Section 9 Sto.oi Water Outlet Protection <br /> <br />ao <br /> <br />Persons shall conduct land-disturbing activity so that the post- <br />construction velocity of the 10-year storm runoff in the receiving <br />watercourse to the discharge point does not exceed the greater of: <br /> <br />The velocity established by the table in Paragraph (d) Of this <br />Section; or <br /> <br />The velocity of the 10-year storm runoff in the receiving <br />watercourse prior to development. <br /> <br />If conditions (1) or (2) of this Subsection cannot be met, then the receiving <br />watercourse to and including the discharge point shall be designed and <br />constructed to withstand the expected velocity anywhere the velocity exceeds <br />the "prior to development" velocity by 10%. <br /> <br />bo <br /> <br />Acceptable Management Measures - measures applied alone or in <br />combination to satisfy the intent of this section are acceptable if <br />there are no objectionable secondary consequences. The NCSCC <br /> <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.