My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1996 08 19
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1996
>
AG 1996 08 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 7:00:01 PM
Creation date
11/27/2017 11:56:04 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/19/1996
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materials and construction were in reasonable close conformity with the Standards and <br />Specifications of the Department. <br /> <br /> (I) Upon completion of the project, the County will furnish the 10th <br />Division Engineer with two (2) complete sets of"As-Built" plans. <br /> <br /> (J) Prior to the final acceptance and payment by the Department, the <br />Division Engineer shall make a final inspection of the completed work. The Division <br />Engineer will be responsible for final acceptance of the completed work on behalf of the <br />Department. <br /> <br /> (K) The County will be responsible for ensuring that the contractor <br />complies with all of the terms of the contract and any instructions issued by the Division <br />Engineer as a result of any review or inspection made by said Division Engineer. <br /> <br /> (L) During construction of the project, the County shall, at no cost to the <br />Department, provide and maintain adequate barricades, signs, signal lights, flagman, and <br />other warning devices for the protection of traffic in confommtion with standards and <br />specifications of the Department and the 1988 edition of the Manual on Uniform Traffic <br />Control Devices for Streets and Highways published by the Federal Highway <br />Administration. <br /> <br /> (M) The County shall complete said work within one (1) year of <br />execution of this agreement. If the County has not completed its responsibilities, or in the <br />opinion of the Department, satisfactory progress has not been made, the unexpended <br />balance of funds may be recalled by the Department and assigned to other projects by the <br />Board of Transportation. <br /> <br /> 6. Subject to compliance by the County with the provisions set forth in this <br />Agreement, the Department shall participate in the construction cost of the project up to a <br />maximum amount of $243,000.00. Construction costs which exceed this amount shall be <br />borne by the County. <br /> <br />-6- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.