Laserfiche WebLink
CHANGE NOTICE <br />CCN# 1 <br />Edison Foard Date: 6/14/2016 <br />ProjectName: Kannapolis Middle School <br />Project Number: Kannapolis Middle School <br />Page Number: 1 <br />Client Address: <br />Work Description <br />This is a cost change for PCO -002 which is changing one receptacle in room F206 to GFCI receptacle, change feeder cable <br />from #1 to 1/0 for panel GENU, adding breaker in MDP for panel RPB1, adding breaker in MDP for panel RPCB1, and <br />changing Panel GENU to 150 amp MLO panel. We reserve the right to correct this quote for errors and omissions. <br />This quote covers direct costs only and we reserve the right to daim for impact and consequential costs. <br />This price is good for acceptance within 10 days from the date of receipt. <br />Werequesta time extension of 3 days. <br />Wowill supply and install all materials, labor, and equipment as per your instructions on CCN# 1. <br />Itemized Breakdown <br />Summary <br />3,044.76 <br />LIGHTING FIXTURES *** Quote needed **" <br />(-1,400.00 @ $0.99) <br />0.00 <br />DISTRIBUTION <br />(1,400.00 @ $1.30) <br />2,575.00 <br />FIRE ALARM *** Quote needed "** <br />(-1.00 @ $4.30) <br />0.00 <br />Material Tax <br />(@ 7.250 `y) <br />186.69 <br />Total Material <br />2,761.69 <br />Subtotal <br />(@ 1.800 %) <br />2,761.69 <br />Overhead <br />(@ 5.000 %) <br />138.08 <br />Markup <br />(@ 5.000 %) <br />144.99 <br />Subtotal <br />3,044.76 <br />#1 WIRE TO GENL1 CREDIT <br />(-1,400.00 @ $0.99) <br />-1,386.00 <br />1/0 NEW WIRE TO GENU <br />(1,400.00 @ $1.30) <br />1,820.00 <br />CREDIT RECEPTACLE IN ROOM F206 <br />(-1.00 @ $4.30) <br />-4.30 <br />ADD GFCI RECEPTACLE IN ROO F206 <br />(1.00 @ $24,89) <br />24.89 <br />Subtotal <br />3,499.35 <br />BOND <br />(@ 1.800 %) <br />62,99 <br />Final Amount <br />$3,562,34 <br />CLIENT ACCEPTANCE <br />ORIGINAL <br />Attachment number 2\n <br />F-7 Page 121 <br />