Laserfiche WebLink
Planning and Zoning Commission <br />Minutes <br />January 8, 2019 <br />15 <br /> <br /> 4. The use as proposed will comply with the general plans for the physical <br />development of the County as embodied in the Zoning Ordinance or in the area development <br />plans that have been adopted. <br /> a) See Applicant’s response to this requirement, which is incorporated by reference <br />as a Finding of Fact. <br /> b) The proposed use adds no new additional burden to the property that would affect <br />the public adversely. <br />EXHIBIT 2 <br />CONDITIONS <br />APPLICATION CUSE 2018-00006 <br />1. Site plan review and approval is required subsequent to Board of Adjustment approval to <br />ensure compliance with all applicable development requirements and conditions. <br />2. The granting order, stating the restrictions and applicable conditions of the approval, shall <br />be recorded with the deed of the property. <br />3. Applicant shall procure any and all applicable federal, state, and local permits prior to <br />commencement of project. <br />4. Any proposed future expansion of the subject property in excess of 45 MGD or <br />modification to the approved Master Plan not required by state or federal regulations <br />must receive Board of Adjustment in the form of an amendment to the Conditional Use <br />Permit unless eligible for administrative approval. <br />5. Applicant must submit permits and documentation as required from NCDEQ for <br />stormwater and soil and erosion control permitting with site plans when submitted to <br />zoning for commercial site plan review and approval. <br />6. Applicant must submit Floodplain Development Permits for all development, as defined <br />by FEMA, located in the regulated floodplain. <br />7. Master Plan shows several new building and building expansions. Future Administration <br />Building, current Administrative Building Expansion, Blower Building, Main Pumping <br />Station Expansion, Chemical Storage and Feed Facility, Electrical Building, Filter <br />Building, Chemical Contact Basin, HPO2 System Expansion, Odor Control Building, <br />Headworks Building Expansion, Biological Treatment Area, Sludge Thickening and <br />Storage Area, and any additional buildings will require building plans to be submitted for <br />construction. <br />8. Master Plan access roads are adequate as shown. If buildings/structures are moved, <br />access roads will need to be addressed further. <br /> <br />