Laserfiche WebLink
Cabarrus County Zoning Ordinance <br />Chapter 7- Performance Based Standards <br />Administrator. A construction trailer or modular unit may be used as a contractor's office or <br />for the storage of equipment or materials. In the event that multiple builders are involved <br />in a new construction project, one construction trailer or temporary modular unit may be <br />permitted per builder for office or for storage. All temporary buildings and trailers shall be <br />completely removed from the site within thirty (30) days of the Certificate of Occupancy <br />being issued for the project. <br />Real Estate Sales Office in a Construction Trailer or Temporary Modular it, Residential <br />used as real <br />1hts within <br />les <br />n iduallot. <br />mber (PIN). <br />shall be <br />Real Estate Office in Model Home <br />Accessory to construction of a new reside <br />on individual parcels. Limited to a period <br />an extension of up to one year if_ppprove <br />Real Estate Office in a Const <br />091 homes must be located <br />one year with the option of <br />ry Modular Unit, Commercial or Mixed <br />Temporary Residence in Manufactured Home During Construction of New Home on Same <br />Site <br />Amended 8/17/2015 <br />Chapter 7 Page 30 of 35 <br />Attachment number 1 \n <br />G -4 Page 311 <br />