My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2012 05 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2012
>
AG 2012 05 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2012 4:46:17 PM
Creation date
11/27/2017 11:08:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/21/2012
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County Schools (CCS) — QSCB Project Budget Modification <br />Mt. Pleasant Elementary School Chillers and Controls Replacement, Central <br />Cabarrus High School Chiller, Cooling Tower and Controls Replacement <br />This budget modification uses QSCB funds budgeted for Mt. Pleasant Elementary <br />School Chillers and Controls to make up for the shortfall in funds for Central Cabarrus <br />High School Chiller, Cooling Tower and Controls Replacement Project. These <br />modifications do not change the total funding for Cabarrus County Schools QSCB <br />projects but merely move funds between school projects to make up for budget <br />shortfalls. <br />The budget information shown below supports this request: <br />Central Cabarrus High School Chiller, Cooling Tower and Controls Replacement <br />Budget As Bid Revised Budget <br />Admin Fees $13,520 $13,520 $13,520 <br />Design Fees <br />Construction Cost <br />Total <br />$34,250 <br />$628,393 <br />$676,163 $746,470 <br />$34,250 <br />$698,700 <br />$44,450 <br />$718,193 <br />$776,163 <br />Mt Pleasant Elementary School Chillers and Controls Replacement <br />Budget As Bid Revised Budget <br />Admin Fees $15,720 $15,720 $15,720 <br />Design Fees $30,250 $30,250 $48,850 <br />Construction Cost $739,987 <br />Total $785,957 <br />Grand Total $1,462,120 <br />$612,000 $621 ,387 <br />$657,970 $685,957 <br />$1,404,440 $1,462,120 <br />This Total Revised Budget transfers $100,000 from the Mt. Pleasant Elementary School <br />Chiller and Controls Replacement project to the Central Cabarrus High School Chiller, <br />Cooling Tower and Controls project to make up for the budget shortfall. Both projects <br />required additional engineering fees to account for increased complexity in the initial <br />project existing conditions survey and the lack of available as -built documents. <br />Since this funding transfer is from two schools this Budget Modification will <br />require DPI Approval. <br />1 <br />Attachment number 1 <br />G -2 <br />Page 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.