Laserfiche WebLink
Cabarrus County Schools (CCS) - QSCB Proiect Budget Modification <br />Central Cabarrus High School Interior Office Renovation Project <br />This budget modification uses QSCB funds budgeted for Central Cabarrus H.S. Exterior <br />Window Replacement and Central Cabarrus H.S. Technology to pay for carpet, floor <br />tile, doors, hardware and code required upgrades to offices and the server room in the <br />Interior Office Renovation Project. These modifications do not change the total funding <br />for Cabarrus County Schools QSCB projects but merely move funds between school <br />projects to make up for budget shortfalls. <br />The budget information shown below supports this request: <br />Central Cabarrus H.S. Interior Office Renovation <br />Original <br />Budget <br />Admin Fees $3,000 <br />Design Fees $25,000 <br />Construction Cost $122,000 <br />Total $150,000 <br />Ac Rir1 <br />$3,000 <br />$31,000 <br />$272,008 <br />$306,008 <br />Current <br />Budget (based <br />on previous <br />amendment) <br />$3,000 <br />$25,000 <br />$252,000 <br />$280,000 <br />2 nd Amended <br />Budget <br />$3,000 <br />$31,000 <br />Central Cabarrus H.S. Window Replacement Project <br />Original <br />Budget <br />Admin Fees $10,500 <br />Design Fees $46,842 <br />Construction Cost $467,658 <br />Total $525,000 <br />•, <br />$10,500 <br />$46,842 <br />$326,183 <br />$383,525 <br />Current <br />Budget (based <br />on previous <br />amendment) <br />$10,500 <br />$337,658 <br />$395,000 <br />$286,077 <br />$320,077 <br />2 nd Amended <br />Budget <br />$10,500 <br />$46,842 <br />$328,658 <br />$386,000 <br />Central Cabarrus H.S. Technology Wireless Cabling and Equipment Upgrades <br />Original Budget As Bid Amended Budget <br />Admin Fees $5,500 $5,500 $5,500 <br />Design Fees $13,293 $13,293 $13,293 <br />Construction Cost $256,207 $225,130 $225,130 <br />Total $275,000 $243,923 $243,923 <br />Grand Total $ 950,000 <br />$ 950,000 <br />1 <br />Attachment number 1 <br />G -2 Page 177 <br />