Laserfiche WebLink
J <br />CM Black Construction — Bid Form Scope ID# 15 -001 <br />Cabarrus County Board of Elections Page 130 <br />Attachment numb �r 3 <br />G -3 <br />Page 226 <br />Bid FOf m Scope ID #15 -001 January 24, 2011 <br />Cabarrus County Board of Elections <br />Concord, North Carolina <br />' <br />Plumbing <br />The undersigned Bidder (Company Name) Heyworth Plumbing Company Inc. , <br />' <br />having carefully Investigated the existing conditions at the project site, and having thoroughly familiarized <br />himself with the Documents contained In the construction drawings & project manual, dated December 24, <br />2010, as prepared by Yates- Chreltzberg- Hughes Architects, 145 Union Street, South, Concord, NC and Its <br />consultants, the CM Black Bid Package, dated December 3, 2010 hereby proposes to provide all necessary <br />' <br />labor, equipment, materials, services, etc., to complete the Plumbing (Supplemental general Conditions <br />and Divisions #15000, #16010, 916020, #16030, #16035, #16040, #02222, 905220) as defined within the <br />Summary of the Work and all other parts of the Contract Documents. Project is located at 369 Church Street <br />North In Concord, NC on property owned by Cabarrus County. All work shall be accomplished in accordance <br />' <br />with the aforementioned Contract Documents with a lump Sum Price as follows: <br />BASE BiD: (including Taxes) sixty Four se „ Dollars 64 , 6 7 5. 0 0 <br />' <br />BASE BID BREAKDOWN (Price Included In Base Bid) <br />Plumbing Piping Bid $ 49, 000.00 <br />Plumbing Fixtures Bid $ 13,375.00 <br />i <br />Plumbing Equipment Bid $ 2 , 3o o.00 <br />The undersigned further agrees that this proposal shall be valid for a period of Sixty (60) days from the date of <br />receipt for the bids and that if this proposal is accepted by the Owner within this period, the Bidder will execute <br />' <br />the contract form and provide surely bonds (If applicable) as described in the Contract Documents. <br />For contracts over $60,000, the undersigned further agrees that In the case of failure on his part to execute the <br />said contract and the bond within ten (10) consecutive calendar days after written notice being given of the <br />t <br />award of contract, the certified check, cash or bid bond accompanying this bid shall be paid Into the funds of <br />the Owner's account set aside for the Project, as liquidated damages for such failure: otherwise the certified <br />check, cash or bid bond accompanying this Proposal shall be returned to the undersigned. <br />It is expressly understood that the Construction Manager is expected to act as project expediter and coordinate <br />work of all other Subcontractors. <br />We estimate North Carolina Sales Tax included within our above designated Base Bid and !or Alternates to be <br />' <br />$ 1, 800.00 . <br />Accompanying this proposal Is a bid security (6% of Contract Sum) in the form of: Bid Bond <br />(for contracts over $50,000.) <br />t Unit <br />Prices: <br />Unit prices quoted and accepted shall apply throughout the life of the contract, except as specifically noted. <br />Unit prices shall be applied, as appropriate, to compute the total value of changes In the scope of the work In <br />' <br />accordance with the contract documents. This project is bid unclassified — unit pricing Is to be used for <br />excavation below subgrade only. <br />' 1. <br />i <br />Trench (confined) Rock Per Cu. Yd. Unit Price $ _ 1, 4 0 0. 0 0 <br />J <br />CM Black Construction — Bid Form Scope ID# 15 -001 <br />Cabarrus County Board of Elections Page 130 <br />Attachment numb �r 3 <br />G -3 <br />Page 226 <br />