Laserfiche WebLink
DIVISION 9 — COMBINED DRYWALL / PAINTING PACKAGE <br />41. The Bid Form ( #09 -003) was changed to reflect the addition of the Corner Guards. <Please use new <br />attached form to submit your bid.> <br />42. Add section #10260 — Corners Guards and Frame Protectors to be provided and installed by the drywall <br />contractor. <br />' 43. Light gage angle at H & H1 wall types shall be installed by the Drywall Contractor. <br />44. Drywall Contractor shall furnish all required blocking for owners provided equipment, shelving, projector <br />and projector screen, TV, marker boards, presentation boards, etc. <br />45. Provide necessary framing and blocking for the air curtain at the Automatic Sliding Doors. <br />' 46. Provide framing and labor for additional 2 x 12 support added per Addenda by the Structural Engineer at <br />existing areas where headers were cut into joist. <br />47. General Notes 8 & 10 on A -1 scope of work shall be by the Painting Contractor. <br />48. Caulking pertaining to running trim, cornices, casings, etc. shall be by the Painting Contractor. <br />' 49. Steel trusses will be sponge blasted to the metal. Some time will lapse before a Painting Contractor will <br />be on board to re -prime them. Any necessary prep and priming of the trusses is by the Painting <br />Contractor. <br />50. Wall fabric at the display cabinets AC -2A, AC -213 and AC -2C is to be by the Painting Contractor. <br />51. Be sure to allow enough time for inspection of the walls prior to painting. <br />DIVISION 9 — ACOUSTICAL CEILING TILE & GRID PACKAGE <br />52. Provide 6'x 20' decorative ceiling and 6" edge binder. <br />53. Provide labor and material for the scope of work described in the General Notes 1 & 2 on A -2. <br />' DIVISION 10 —TOILET PARTITIONS & TOILET ACCESSORIES PACKAGE <br />54. The Bid Form ( #10 -002) was changed to reflect the addition of the installation of Owner provided <br />accessories. <Please use new attached form to submit your bid.> <br />55. Labor to install. Owner provided accessories in to be by this subcontractor. <br />DIVISION 15 — PLUMBING PACKAGE <br />56. The Bid Form ( #15 -001) was changed to reflect the deletion of the installation of Gas Piping. <Please <br />use new attached form to submit your bid.> <br />57. Change to the CM Black Bid Package Proposal — Gas piping shall be provided and installed by the <br />Mechanical Contractor. <br />58. Temporary Water Service & Piping — (1) hose bib for masonry. <br />59. CM Black is to pay for water usage. <br />60. Soundproof penetrations where required. <br />' DIVISION 15 — HVAC PACKAGE <br />61. The Bid Form ( #15 -002) was changed to reflect the addition of the installation of Gas Piping. <Please <br />' use new attached form to submit your bid.> <br />62. Change to the CM Black Bid Package Proposal — Gas piping shall be provided and installed by the <br />Mechanical Contractor. <br />63. Remove and replace any existing concrete, masonry, wood, etc required for installation of your scope of <br />work. Replace with matching or specified product and finished per the Construction documents. <br />64. Soundproof penetrations where required. <br />65. Waterproof coverings of roof cubs shall meet OSHA standards for pedestrian walkways if units are not set <br />' Immediately. <br />66. Mechanical Contractor shall supply any necessary wood blocking at cubs or any other locations required. <br />67. All duct and equipment shall arrive onsite, sealed from dust and contaminates and shall be maintained <br />daily throughout the project. <br />DIVISION 15 — FIRE PROTECTION PACKAGE <br />68. Remove and replace any existing concrete, masonry, wood, etc required for installation of your scope of <br />work. Replace with matching or specified product and finished per the Construction documents <br />Cabarrus County Attachment number 3 <br />' Board of Elections Project Page 3 <br />G -3 Page 244 <br />