My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2011 03 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2011
>
AG 2011 03 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 9:14:17 PM
Creation date
11/27/2017 11:14:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/21/2011
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />I I <br />V A T E' 8 ■ C 11 It E l 1 1 , % 11 E It G <br />ADDENDUM NO. 1, DATED JANUARY 25, 2011 <br />TO THE DOCUMENTS FOR <br />UPFIT OF OLD CREAMERY BUILDING <br />FOR THE CABARRUS COUNTY BOARD OF ELECTIONS <br />CONCORD, NORTH CAROLINA <br />COMM. NO. 10032.00 <br />CHANGES TO PROJECT MAN UALISPECIFICATIONS <br />GENERAL REQUIREMENTS <br />SECTION 01011— SUMMARY OF WORK <br />e 11 U G 11 E S <br />1. On page 01011 -1, under FIRE PROTECTION revise the first sentence to read: "Connect to existing sprinkler <br />main capped off in the shell space (work shall begin at the flange and shall not include any work to the <br />surrounding concrete slab) ". <br />2. On page 01011 -2, under ELECTRICAL delete the last sentence in its entirety as plugmold is not required by the <br />scope of work. <br />I SECTION 01742 -ROOFING GUARANTEE <br />3. On page 01742 -1, the third paragraph is revised to read: "The Construction Manager at Risk shall warrant the <br />new material and workmanship of the roofing work against leakage and against defects due to faulty materials, <br />workmanship and contract negligence for a period of three (3) years following acceptance of the project by the <br />Owner." <br />' ARCHITECTURAL <br />SECTION 06220 — ARCHITECTURAL CASEWORKIWOODWORK <br />4. On page 06220 -6, under PART 2 — MATERIALS AND PRODUCTS, Solid Hardwood add the following sentence <br />to the end of the paragraph. "AII material shall be FSC certified, whether premanufactured or made by custom <br />run." <br />' 5. On page 06220 -6, under PART 2 — MATERIALS AND PRODUCTS, Solid Wood add the following sentence to <br />the end of the paragraph. "All material shall be FSC certified, whether premanufactured or made by custom run." <br />6. On page 06220 -8, under PART 2 — MATERIALS AND PRODUCTS, CABINET HARDWARE AND ACCESSORY <br />' MATERIALS, add the following paragraph: "Ad ustab a Shelf Standards nod Suogorts As manufactured by <br />Knape & Vogt: K &V No. 255AL and 256R Zc for use with end supported glass shelves." <br />7. On page 06220 -10, PART 3 — DESCRIPTION OF TYPES, PROCEDURES, AND FABRICATION, Finishing, <br />delete the first, eighth, ninth, tenth and eleventh paragraphs as shop finishing of wood trim is not required. All <br />woodwork in finished under Section 09900 as noted in the second paragraph of page 06220 -1. <br />' files:adminNATES2010:10032.00 CC Board of Elecdons:Tech:AddendaAddendum No 1.doc <br />Attachment number 3 <br />' G -3 Page 246 <br />
The URL can be used to link to this page
Your browser does not support the video tag.