Laserfiche WebLink
1 <br />FIRE PROTECTION <br />' SHEET FP -1 - NOTES AND DETAILS <br />39. Add Fire Pump Test Report, dated 91712010, and the associated graph to this sheet. Data and graph included as <br />' an attachment to this Addendum. This fire pump flow test may be used to generate shop drawings, however, the <br />fire pump shall be tested after substantial completion to confirm calculations. <br />' SHEET FP -2 - FLOOR PLAN AND SHEET FP -3 HEAD LAYOUT <br />40. The symbol of a square with a "P" Inside represents a printer. <br />' MECHANICAL <br />SHEET M -3 - ROOF PLAN <br />' 41. 11M -3 ROOF PLAN. Change the note describing solar tubes to read: "SOLAR TUBES, TYP. REFER TO <br />ARCHITECTURAL DRAWINGS." No work associated with the solar tubes is required of mechanical contractor. <br />ELECTRICAL <br />' SHEET E -1 - ELECTRICAL SYMBOLS & SCHEDULES <br />42. Under the list of ALTERNATES, add: 11 #8 STATE THE AMOUNT TO BE DEDUCTED FOR DELETING THE FM <br />200 FIRE SUPPRESSION SYSTEM IN BALLOTS 128 AND PROVIDING SPRINKLER HEADS INSTEAD." <br />43. Under the list of symbols add a square with a "P" inside to indicate the location of a printer to be supplied by the <br />Owner. <br />' SHEET E -3 - FLOOR PLAN POWER <br />44. Floor and wall boxes indicated by a circle with a "F" and a circle with a "C' are for furniture whips. Coordinate <br />' with the Owner's IT representative as to how many voice /data pulls to each junction box. Provide a minimum <br />conduit size of 1 -1/4" for both power and data. See attached cut sheets for the floor box. Provide a minimum 4" <br />x 4" box for the wall installations. <br />' SHEET E -5 - FLOOR PLAN HVAC POWER <br />45. At the south side of the building, the note describing the Air Curtain is revised to read: " AIR CURTAIN — <br />PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR." In addition, the notes labeling the ceiling <br />' unit heaters (CUH) Is revised to read: " CUH -1 -- PROVIDED AND INSTALLED BY MECHANICAL <br />CONTRACTOR" and " CUH -2 — PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR." <br />' 48. At the north side of the building, the note describing the Electrical Wall Heater is revised to read: " ELECTRIC <br />WALL HEATER — PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR: <br />' END OF ADDENDUM <br />Attachments: Fire Pump Test Report —The Creamery 9/27!2010 <br />Floor Box cut sheets <br />i <br />' 145 Union Street South ■ Concord, NC 28025 ■ Tel 704.788.2000 ■ Fax 704.788.2010 ■ www.ycharch.com <br />5 Attachment number 3 <br />' G -3 Page 250 <br />