My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 03 18 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 03 18 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:03 PM
Creation date
11/27/2017 11:42:47 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/18/2002
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(A) The construction engineering and supervision will be furnished by the <br />County without cost to the Department. <br /> <br /> (B) The Department's Division Engineer for the 10th Division, at his <br />discretion, may assign a resident engineer to the project who shall have -the right to inspect <br />any portion of the work being performed by the County or the County's contractor to ensure <br />compliance with the provisions of this Agreement. The resident engineer will be the <br />Department's representative on the Project. The resident engineer will furnish the County <br />with any forms that may be needed in order to follow standard Department practices and <br /> <br /> I <br />procedures in the administration of the contract. <br /> <br /> (C) Letting of contracts for construction and purchases shall be. in accordance <br />with North Carolina General Statute 143-129. <br /> <br /> (D) The Department's 10th Division Engineer shall have the right to inspect, <br />sample or test, and approve or reject any portion of the project during construction. <br /> <br />(E) The County shall samPle and test all materials in reasonable close <br />conformity with the Department's Guide for. Process Control and Acceptance Sampling and <br /> <br />Testing. <br /> <br /> (F) During construction of the project, if any changes in the plans are <br />necessary, such changes must be approved by the 10th Division Engineer prior to the work <br />being performed. <br /> <br />(G) All materials incorporated in the project and.workmanship performed by <br />the contractor shall be in reasonable close conformity with the Standards and Specifications <br /> <br />of the Department. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.