Laserfiche WebLink
2 <br /> <br />1. The County shall prepare the environmental and/or planning document and <br /> <br />obtain any environmental permits, and the plans, contractor speCifications and estimates <br /> <br />(PS&E package) needed to construct the project. All Work shall be done in accordance with <br />.Departmental standards, specifiCations, policies and procedures. <br /> <br />2. The County, without any cost or liability whatsoever to the Department, shall <br /> <br />relocate and adjust all utilities i~n~lcOnfl.ict w~th the project. Said work shall be performed in a <br />manner satisfactory to the Deptrtment prior to the County beginning construction of the <br />project. <br /> <br />3. The'County, at ho expense or liability whatsoever to. the Department, shall be <br /> <br />responsible for acquiring an~., needed right of way and/or permanent easements required for <br /> <br />said project. Acquisition ofiright of way shall be accomplished in accordance with the Right <br />of Way Acquisition Policyf~,nd Land Acquisition Policy contained in the Federal-Aid Policy <br />Guide', Part 712, Subpa~ B, and in accordance with policies and procedures set forth in the <br />North Carolina Right ¢/,'VVay Manual (Uniform Relocation Assistance and Real Property <br /> <br />AcquisitiOn Policies/~ict of 1970). The County shall remove from said right of way all <br /> .,, <br /> <br />obstructions and er~roachments of any kind or character (including hazardous and 'mat/r <br />contaminated ials). The County shall indemnify and save harmless the Department <br /> ? <br />from any and all claims for damages that might arise on account of said right of way <br /> <br />acquisition, and, ~onstruction easements for the construction of said project. <br /> <br />4. The County shall construct, or cause to be constructed, the project in <br /> <br />accordance.,~:~ith the plans and specifications of said project as filed with, and approved by, <br /> <br />the Department. The County shall enter into and shall administer the construction contract <br /> <br />for said project and the procedures set out herein below shall be'followed: <br /> <br /> <br />