My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 12 16 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 12 16 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:02:05 PM
Creation date
11/27/2017 11:44:46 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/16/2002
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F~daml Communl~dnr~ Comm~s~fon Approved by OMa <br />W~hl~llmn, D, C, <br /> <br />Abbreviated Coat of Service Filing <br />For Cable Network Upgrades <br /> <br />rt I. Guellflcatlon for Upgrade Rata Adjustment <br /> <br /> Slgnh'leanca of Upgrade O. uallflcatJon <br /> <br /> Dose thc upgrade mca: the minimum technluel apacl~catlone deaodbad In ma Instructions for Pert l, <br /> C2uallfioatlon for Upgrade Rate Adjustment, Line 17 <br /> <br /> Yes No <br />X <br /> <br /> II "Mo' was answered In question 1, ettm--h e brief description of how subscribers to Basic end Cable <br /> Programming Service Tiara will benefit from the capital Improvements, <br /> <br /> Complete the foflawlng Items to determine the cost ~f the capital Improvement ea ~ percentage of rate <br /> base (investment In cable property, plant and equipment fat the aras over whloh the Improvement will be <br /> <br />A, The net upgrade rats baas 111,994~B65 <br />B. Total rate beam after upgrade a12,TBO, g2B <br />C. Fsrosntage of upgrade to total rata baas ~ <br /> <br />Used & Uaal'ul Qualification <br /> <br /> form hem been completed for a pre-approval, please skip to fins <br /> <br />Has the upgrade bean completed? <br /> <br /> X Yea No <br /> <br />If qusstlon 1 was answered "yea#, enter the data the upgrade wis completed sod began provlolng <br />mervlca to subsorlbera of regulated aer~lcasl August 1 BBB <br /> <br />If the Phased-In Approach In elected, attach e description of the eubse~ona'lnvolved end the projected <br />dates on which the upgrade will ba completed sod provldh~g service to subscribers of rate regulated <br />aervlcU wlthln those subsections, <br /> <br />Pegs 2 of a <br /> <br />FCC FormI23e <br /> ryleea <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.