My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 12 16 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 12 16 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:02:05 PM
Creation date
11/27/2017 11:44:46 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/16/2002
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule C <br /> <br />1. Total Maintenance/Service Hours were calculated by converting the number of service calls <br />based on a standard time (approximately 30 minutes) or with similiar allocations. These hours are <br />added to the equivalent hours for outside converter repair, calculated by dividing converter expenses <br />by average hourly service rate. The total hours were allocated to each type of equipment using the <br />same percentages developed in ~.4 below. <br /> <br />2. The number of units in service as reported come from system's billing reports for the period <br />ended 9/30/02. <br /> <br />3. Gross book value, accumulated depreciation and current provision for depreciation related <br />to converters and remotes were reported as of 9/30/02. <br /> <br />4. In systems where we report only one ledger account for addressable, nonaddressable <br />and remotes, an allocation (or similiar allocation) was done based on replacement cost multiplied <br />by the current units in each category. A weighted average percentage was then calculated and <br />applied against the general ledger amount to derive each category (addressable, <br />nonaddressable and remote). <br /> <br />Schedule D <br /> <br />1. The average time to perform each type of installation was based on historical estimates (or similiar) <br />developed by each system and then weighted across all systems state wide based on basic <br />customer countS. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.