My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2000 04 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2000
>
AG 2000 04 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:57:12 PM
Creation date
11/27/2017 11:47:06 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/17/2000
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cabarrus County Findings and Recommendations Report <br /> <br />The RFP requested the rates for leasing the system. These figures are shown below. This <br />information is shown for reference purposes only, as we believe that Cabarms County may have <br />other more cost effective means of obtaining financing if needed. Ifa purchase lease is used, the <br />County could purchase the system at the end of the lease term. With a tree lease the County <br />would have to pay the fair market value for the equipment at the end of the lease if they wished <br />to retain the equipment. <br /> <br />Sprint has several leasing options including "Telimagine Technology Plan" which is explained in <br />depth in their proposal. The figures provided by CTC are for a leasing arrangement with either a <br />purchase option of 1-month lease payment, or a full service lease with no purchase option. <br />Although ALT Communications has several attractive purchase and leasing arrangements <br />available, they did not provide details. <br /> <br />VENDOR (Bu¥out) 36 Months 48 Months 60 Months <br />:CTC (Buyout = one month payment) .03369 .02583 .02275 <br />Sprint (Municipal Lease) .030877 .023826 .01961 <br />ALT Communications N/A N/A N/A <br /> <br />OPTIONAL EQUIPMENT <br /> <br />In the RFP, we requested that vendors provide optional pricing for various components of system <br />equipment and software. In addition, the vendors included other options that their particular <br />systems offered. <br /> <br />Listed below are some of the more significant options quoted by the vendors. A description of <br />each of these options follows. <br /> <br />ITEM/VENDOR CTC ALT Sprint <br />Uninterruptible Power Supply $14,625 $5,669 $18,921.49 <br />System Administration $31,146 Not provided $8,291.24 <br />Headset $100 $265 $135.48 <br />Call Accounting $4,320 Included Cost Not <br /> provided <br />25' Handset Cord $4.66 $10.00 $2.84 <br />25' Base Cord $4.66 $10.00 $2.84 <br /> <br />© 2000, RSM McGladrey, Inc. ~ ' t ~ Page 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.