Laserfiche WebLink
Mr. Jay Shive <br />July 28, 1997 <br />Page Two <br /> <br />2e <br /> <br />Section 8.0, "Inundation Mapping" of the "Emergency Action <br />Plan" shall be completed within one year of receipt of this <br />letter. <br /> <br />A "sunny day" breach and a breach during the 3/4 Probable <br />Maximum Precipitation design storm event shall be used for <br />the inundation mapping. These breach scenarios will provide <br />lower and upper limits of downstream flooding as a result of <br />dam failure. <br /> <br /> The Land Quality Section staff will make periodic <br />inspections of this dam to assure that the dam is being <br />maintained in good operating condition. These inspections, <br />however, will be relatively infrequent. It is advised that you <br />closely inspect and monitor your dam, and that you notify your <br />engineer and the Division of Land Resources if you see or suspect <br />any problems concerning its safety. <br /> <br />Sincerely, <br /> <br />Charles H. Gardner, P. G., P. E. <br /> <br />CHG/JKL/ <br /> <br />CC: <br /> <br />Mr. G. Douglas Miller, P. E. <br />Mr. John C. Murdock, III <br />Mr. Blair Bennett <br />Mr. Fletcher Hartsell, Esq. <br />Mr. Mark E. Lambert, P. E. <br />Mr. L. E. Baker, P. E. <br />Mr. Paul C. Watson, Jr., P. E. <br />Mr. Jack R. Miller, P. E. <br /> <br /> <br />