My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March-12-2019-Minutes
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2019
>
March-12-2019-Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 4:45:57 PM
Creation date
5/31/2019 3:28:03 PM
Metadata
Fields
Template:
Planning Minutes
Planning Minutes - Date
6/12/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Specific Requirements <br />The Zoning Ordinance also imposes SPECIFIC REQUREMENTS on the use(s) requested by the <br />applicant. The applicant should be prepared to demonstrate that , if the land is used in a manner <br />consistent with the plans, specifications , and other information presented to the Board, the proposed <br />use(s) will comply with specific requirements concerning the following: <br />Nature of use (type, number of units , and/or area): <br />Proposed 170-foot monopole-style wireless telecommunications facility. <br />Accessory uses (if any): <br />Setback provisions: <br />Principle Use <br />Front: 879'-2" 353'-11" Side yard Single: Side yard Total: 220'-0" <br />Accessory Use <br />Front: <br />Height provisions: <br />Side yard Single: __ <br />Principle Use: 170-feet <br />Side yard Total: __ <br />Accessory Use: __ <br />Off street parking and loading provisions: (include calculations) <br />Please see Sheet C2 of the Site Plans and Drawings, attached hereto as Exhibit "I". <br />Sign provisions: (include sketch drawing with dimensions) <br />Please see Sheet C5 of the Site Plans and Drawings, attached hereto as Exhibit "I". <br />Provisions for screening landscaping and buffering: (show on site plan) <br />Please see Sheet L1 of the Site Plans and Drawings, attached hereto as Exhibit "I". <br />Text <br />Rear: 2,170'-9" <br />Rear: <br />Provisions for vehicular circulation and access to streets: (provide NCDOT permit and/or TIA) <br />_______ Please.see-Sbeet_Cl_of the-Site Rlans -and-Dr-awings r attached-hereto-as-Exbibi " ~wiILbEWJtiUzjng-existing..access _____ _ <br />from Odell School Road. After a 60 day construction period, Verizon will only visit the facility for routine maintenance <br />approximately 6-8 t1mes per year. . <br />. . t'
The URL can be used to link to this page
Your browser does not support the video tag.