Laserfiche WebLink
DIVISION 9 — METAL STUD FRAMING / DRYWALL / PAINTING PACKAGE <br />3. Access doors are to be provided by the trade requiring access and framed by the Drywall Contractor. <br />YATES- CHREITZBERG- HUGHES ARCHITECT CLARIFICATIONS <br />4. Yates- Chreitzberg- Hughes Architect's Addendum No. 2 — dated 01/31/11 is also Incorporated into this <br />addendum — please see the attached (1) page. <br />END OF ADDENADA <br />Cabarrus County Attachment number 3 <br />Board of Elections Project Page 2 <br />G -3 Page 257 <br />0 <br />