Laserfiche WebLink
ICASARR~SCO~N~I <br /> NO~1H CAROLINA <br /> <br />ANIMAL SHELTER/GENERAL SERVICES PROPOSALS <br /> <br />1) Knapp - Schmidt - Baptista Architects <br /> Option A <br /> Preliminary Schematic Design Phase (already contracted)....$6,000 <br /> Second Stage....8% but not exceeding $20,000 <br /> unless construction budget increased by private donation then <br /> 8% of total construction cost. Four parts of Second Stage. <br /> Design Development (DD) 30% <br /> ConstruCtion Documents (CD) 46% <br /> Ridding or Negotiation (BN) 4% <br /> Construction (CP) 20% <br /> <br />Option B <br /> Construction Contract Administration and Construction Observation <br /> by others: Compensation would be reduced as follows: <br /> Second Stage 8% of total construction less: <br /> Construction Phase ......... reduced from 20% to 10% <br /> Bidding or Negotiation....reduced from 40% to 0% <br /> <br />Compensation is then 86% of 8% of total construction cost. Their estimated <br />cost is $458,662 (for a 6287 s.f. Building) so 8% is $36,693 and 86% (the <br />reduction given for not overseeing the construction) is $31,556 <br /> <br />2) Overcash - Demmitt Architects <br /> Option A <br /> KSB completes construction documents, Overcash - Demmitt handles <br /> bidding, permitting and construction administration on Animal <br /> Shelter and design, construction documents, bidding permitting, and <br /> construction administration on 5,000 square foot General Services <br /> Building. Total cost $19,750. plus reimbursables. Added to KSB's fee <br /> the total architectural/engineering fee for both buildings would be <br /> $51,306. <br /> <br /> Planning, Zoning, and Building Inspection <br /> <br />P 0 Box 707., Cor~ccrd, NC 2~09~$-0707 , ~l~nni~g: (704.) 788-8~4~ ,, Zoning' (704) 788~8!37 ~, Building Inspection: (704) 788-8128 <br /> <br /> <br />