My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March-12-2019-Minutes
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2019
>
March-12-2019-Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 4:45:57 PM
Creation date
5/31/2019 3:28:03 PM
Metadata
Fields
Template:
Planning Minutes
Planning Minutes - Date
6/12/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 30, 2019 <br />Page 4 <br />Section 6 Permit Requirements <br />No wireless telecommunications tower or antennae shall be erected or established <br />unless and until a Zoning Clearance permit has been issued pursuant to this Ordinance. <br />The Applicants accept and acknowledge this provision. <br />A Stealth Antenna which does not exceed sixty-five (65) feet in height is permitted as of <br />right and does not require a conditional use permit. <br />The Applicants accept and acknowledge this provision. <br />In addition to procedures, standards and criteria set forth in this Ordinance, conditional <br />use permits for towers and antennas shall be issued in accordance with the following <br />proVIsIOns: <br />Towers or antennas sixty-five (65) feet or more from the average ground level shall <br />require a conditional use permit. This applies to mounted antennas, referring to the <br />total height from the base of the building or other structure to the top of the antennas. <br />The Applicants accept and acknowledge this provision. <br />) Any information of an engineering nature that the applicant submits, whether civil, <br />mechanical, or electrical, shall be certified by a professional engineer licensed in the <br />State of North Carolina. <br />The Applicants accept and acknowledge this provision. <br />In addition to any other information required pursuant to this Ordinance, applications <br />for conditional use permits for towers shall include the following information: <br />a. A site plan consistent with the procedures of this Ordinance which clearly <br />indicates the location, type, and height ofthe proposed tower;; on-site land uses <br />and zoning;; adjacent land uses and zoning (including when adjacent to other <br />zoning jurisdictions);; adjacent roadways;; proposed means of access;; setbacks <br />from property lines elevation drawings of the proposed tower and any other <br />structures;; and other information deemed by the Administrator to be necessary <br />to assess compliance with this Section. <br />Please see Exhibit "1". <br />b. The setback distance between the proposed tower and the nearest residential unit <br />and residentially zoned properties. <br />Please see Sheet C1 of Exhibit "1". <br />c. The availability of suitable existing towers, other structures, or alternative
The URL can be used to link to this page
Your browser does not support the video tag.