My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March-12-2019-Minutes
CabarrusCountyDocuments
>
Public Meetings
>
Meeting Minutes
>
Planning
>
2019
>
March-12-2019-Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 4:45:57 PM
Creation date
5/31/2019 3:28:03 PM
Metadata
Fields
Template:
Planning Minutes
Planning Minutes - Date
6/12/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />4 <br />DRIVEWAY THAT WAS NOT PERMITTED WITH NCDOT (SEE LANDSCAPE PLAN) <br />Applicant has stated that this road has not been used since the NOV was issued and <br />will no longer be used as a road. <br />The current landscape plan shows this area being filled in with eleven American Hollies. <br />See plans page L-1.3 <br /> <br /> If the Board decides that the applicant has demonstrated that this road does not <br />need to be permitted through NCDOT, the Board should enter that information <br />into the record and consider the next item. <br /> If the Board decides that the applicant has not demonstrated that this road <br />should not be permitted with NCDOT, the Board needs to provide specific <br />direction to the Applicant <br />OVERHEAD LINES/CHANGES TO PANEL CONFIGURATIONS (INFORMATION <br />PROVIDED PREVIOUSLY/SEE SITE PLAN ) <br />The original CUP site plan from 2017 did not include overhead power lines interior to <br />the site. All lines were to be underground. It also did not include panels in some of the <br />areas where panels have not been installed, specifically on the south east part of the <br />5M’s tract near Bost Creek. <br />The overhead lines and the additional panels were observed by the Board on the two <br />site visits. <br /> If the Board is satisfied with the current modification of the site design, including <br />the overhead power lines, the Board should enter that information into the record <br />and consider the next item. <br /> If the Board is not satisfied with the design changes, the Board needs to provide <br />specific direction to the Applicant. <br />Staff Review Comment: <br />As stated in the original staff report and during the meeting, t he lines and the current <br />configuration of the panels are located interior to the site and out of the required 100 <br />foot setback and 100 foot landscape buffer. <br />SEDIMENT PONDS AND STORMWATER RUNOFF (SEE SITE PLANS) <br />Board members asked several questions on the site visit related to the stormwater <br />basins and site runoff. <br />Notes have been added to the plan related to the stormwater basins.
The URL can be used to link to this page
Your browser does not support the video tag.